Separating planned maintenance from hours the line simply did not run
A four-hour ‘engineering’ block on a Friday can hide two hours of waiting for a part that was never booked. The chart only helps if the diary and the log agree.
Journal
Short pieces on how lost hours hide in codes, diaries, and first hours after a change of pack.
A four-hour ‘engineering’ block on a Friday can hide two hours of waiting for a part that was never booked. The chart only helps if the diary and the log agree.
The tallest bar is often the most popular code, not the most expensive wait. Supervisors reach for ‘other’ when the radio is busy.
A laminated seconds-per-piece figure is a target, a memory, or a leftover from a different pack. Throughput cares which of those it is.
We would rather have messy complete books than a tidy spreadsheet that dropped the night shift. Completeness beats presentation.
The run rate at hour four is a poor alibi for hour one. Start-up has its own waits: tickets, film, the previous SKU still in the hopper.